TARSPRA / Resin installation planner
OptiLay
Structure First. Surface Second.
2Review & results
- 1Survey & levels
- 2Excavation
- 3Drainage
- 4Foundation & base
- 5Surface
Project & build-up
Structure check
Outstanding structure checks must be resolved before surfacing.
Material take-off
Quantities withheld until coverage and recipe are confirmed. DALTEX preset supports exact 15 or 18 mm depths only; other recipes need batch-specific supplier instructions.
DALTEX mix-design guidanceOn-site catalyst check
Daltex · 7.5 kg kit · measured conditions only. Forecast and cure checks remain separate.
Dose not confirmed
Record measured air temperature, humidity and dry conditions first.